RDSS 2.0
Transmission, Substation & Power Development

RDSS 2.0

Sarvadnya Energies Portfolio

Overview

Project Mission

The RDSS 2.0 Konkan Project modernized regional distribution infrastructure. We executed a 45+ km transmission network, 10 MVA transformers, and new 33/11kV substations across multiple regions.

Scope of Work

Execution of 45+ km overhead transmission line
Installation of 5+ transformers (up to 10 MVA)
Erection of 4+ additional bay feeders (3+1 configuration)
Development support for 2 new 33/11kV Power Substations
Complete site foundation and system synchronization

Execution Approach

1

Multi-location hardware deployment

2

Parallel work fronts at substations and line routes

3

High-precision 10 MVA transformer placement

4

Isolator, breaker, and busbar configuration

5

Real-time coordination across four major regions

Developer

NCC

Location

Nashik, Ahilyanagar, Sangamner, Shree Gonda

Infrastructure

45km Line, 2 PSS Substations

Transformers

5+ Units (up to 10 MVA)

Timeline

40 Weeks

Status

Project Fully Commisioned & Verified

Engineering Deep-Dive

Technical Analysis

Site Constraints

  • Multi-location deployment requiring synchronized workflows

  • Hilly terrain impacting alignment and installation

  • Major Right of Way (ROW) challenges across public corridors

  • Parallel work fronts across distributed sites

Technical Challenges

  • Managing multi-location execution with synchronized workflows

  • Accurate alignment of 45+ km transmission network

  • Stable grid connectivity and synchronization

  • Precision installation of 10 MVA transformers

  • Maintaining quality under strict 40-week timeline

Scale & Complexity

  • Large-scale execution across 45+ km transmission network

  • Integration of transformers and substation units

  • Multi-location deployment across four major regions

  • Handling high-voltage 33kV / 11kV infrastructure

Compliance Considerations

  • Adherence to electrical safety standards and project specifications

  • Compliance with grid and utility integration requirements

  • Ensuring structured execution aligned with project guidelines

  • Maintaining safety protocols during all phases of execution

Execution Results

Impact & Delivery

Evidence of Success

Project Impact

Our execution methodology is designed to create measurable value for stakeholders, the community, and the national energy infrastructure.

Significantly strengthened regional grid capacity

Modernized power flow through new substation units

Handled complex ROW challenges across private and public land

Improved operational efficiency across Konkan region utility grid